Schneider Electric ALTIVAR 58 TRX Guía de instalación Pagina 2

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 126
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 1
See page 17 for the Minimum Start-Up Procedure.
DANGER
HAZARDOUS VOLTAGE
Read and understand this bulletin in its entirety before installing
or operating Altivar 58 TRX drive controllers. Installation,
adjustment, repair, and maintenance of the drive controllers must
be performed by qualified personnel.
The user is responsible for conforming to all applicable code
requirements with respect to grounding all equipment.
Many parts in this drive controller, including printed wiring boards,
operate at line voltage. DO NOT TOUCH. Use only electrically
insulated tools.
DO NOT short across DC bus capacitors or touch unshielded
components or terminal strip screw connections with voltage
present.
Before servicing the drive controller:
Disconnect all power including external control power that
may be present before servicing the drive controller.
Place a “DO NOT TURN ON” label on the drive controller
disconnect.
Lock the disconnect in open position.
WAIT TEN MINUTES for the DC bus capacitors to discharge.
Then follow the DC bus voltage measurement procedure on
page 98 to verify that the DC voltage is less than 45 V. The
drive controller LEDs are not accurate indicators of the
absence of DC bus voltage.
Install and close all covers before applying power or starting and
stopping the drive controller.
Electrical shock will result in death or serious injury.
Vista de pagina 1
1 2 3 4 5 6 7 ... 125 126

Comentarios a estos manuales

Sin comentarios