Schneider Electric ALTIVAR 58 TRX Guía de instalación Pagina 101

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 126
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 100
© 1998–2003 Schneider Electric All Rights Reserved
VVDED397047USR6/03 Chapter 3—Diagnostics and Troubleshooting
06/2003 Procedure 2: Checking Supply Voltage
101
Procedure 2: Checking Supply Voltage
Measure the input line voltage to determine if the voltage is within the
drive controller tolerance.
1. Perform the Bus Voltage Measurement procedure on page 98.
2. Attach meter leads to L1 and L2. Set the voltmeter to the 600 Vac
scale.
3. Reapply power and check for the correct line voltage, shown on
the drive controller nameplate rating.
4. Remove power and repeat the procedure for L2 and L3, and L1
and L3.
5. When all phases have been measured, remove power. Remove
leads and replace all covers.
Figure 26: Power Terminal Layout
PA PB
L1 L2 L3 U V W
+-
PA
PB
L1 L2 L3 UV
W
++
-
UV
W
L1 L2 L3
L1 L3L2
+U
VW
-
L1 L2 L3
++U
VW
-
Do not use
ATV58HU18N4 to D23N4
ATV58HD25N4(X) and D79N4(X)
ATV58HC10N4(X)
ATV58HC13N4X to C19N4X
ATV58HC23N4X to C33N4X
Vista de pagina 100
1 2 ... 96 97 98 99 100 101 102 103 104 105 106 ... 125 126

Comentarios a estos manuales

Sin comentarios