Schneider Electric Xantrex XW Guía de instalación Pagina 43

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 62
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 42
Commissioning
975-0540-01-01 Revision B 2–25
This guide is for use by qualified personnel only.
If you are commissioning multiple charge controllers, follow these steps to copy
the settings from the configured charge controller to the other charge controllers:
1. On the Select Device menu, select the next charge controller for
configuration.
The Setup menu opens.
2. Press Enter to select Advanced Settings.
The Config menu opens.
3. Scroll to Copy from, and then press Enter to select the charge controller
from which you want to copy. Scroll to select the charge controller with the
device number that matches the first charge controller you configured, and
then press Enter again.
The settings are automatically copied from the selected charge controller.
4. Repeat steps 1 to 3 for the remaining charge controllers.
5. After you have finished configuring, press the Enter, up arrow, and down
arrow buttons simultaneously to hide the Advanced Settings menu item.
Starting the Unit
To start the charge controller or charge controllers:
Close the PV array disconnect switch.
The charge controller or charge controllers start up and wait for a short period to
determine that the input voltage is greater than the minimum PV array start
voltage. After the input voltage exceeds the minimum PV array start voltage, the
charge controllers begin operating.
NOTICE
The Copy from command will not give you any indication that it has
completed its task. To check that the charger settings have been copied
properly, view some of the settings you originally configured.
Vista de pagina 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 61 62

Comentarios a estos manuales

Sin comentarios