Inverter/Charger Installation
2–10 975-0239-01-01
This manual for use by qualified personnel only
Batteries
See the FAQs section of the Schneider Electric Web site for information on
determining battery bank requirements.
Consider the following recommendations for battery use.
Use only the deep discharge types for inverter applications.
Use the same battery type for all batteries in the bank.
Use only batteries from the same lot and date in your battery bank.
This information is usually printed on a label located on the battery.
Figure 2-8 Routing Communications Cables
Route the communications cables for any
accessories being installed BEFORE
making AC or DC Connections.
IMPORTANT: When routing communications cables through
the Xantrex XW Power Distribution Panel, the raceway conduit
must be used to keep the communications cables separate
from the power cables.
Raceway for
Communications
Cables*
Raceway for
Communications
Cables*
Do not connect to
the BTS to the
batteries until the
battery bank has
been prepared
and is ready to
connect to the
inverter.
Xantrex XW
Automatic
Generator Start
Xantrex XW System
Control Panel
BTS
See Figure 2-14 on
page 2–21 for an
illustration showing
the Communications
Ports and where the
accessories connect.
Raceway for Shunt
Sense cable*.
Raceway exits the
panel through the
back.