Inverter/Charger Installation
2–4 975-0239-01-01
This manual for use by qualified personnel only
Clearance Requirements
Provide a minimum clearance of 6 inches (15 cm)—12 inches is preferred—
around the top and 6 inches (15 cm) at the bottom of the inverter for ventilation.
There must be at least three feet of clearance in front of the inverter. Ensure that
the vents are not obstructed with foreign objects and that the minimum
clearances are met.
Mounting
The Xantrex XW Power System is designed to be mounted on a vertical surface.
The supporting surface must be strong enough to support a minimum of
500 pounds (227 kg). To facilitate installation, a wall mounting plate
(manufacturer part number 210-0462-01-01) is provided for each Xantrex XW
Inverter/Charger and Xantrex XW Power Distribution Panel. The mounting plate
and hardware on the Xantrex XW Inverter/Charger and Xantrex XW Power
Distribution Panel are designed to meet standards for structural and seismic
stability. When properly installed, the system also meets Section 59 of UL 1741
for Static Loads.
Figure 2-3 Clearance Requirements