VIEW
VIEW
MODE
A.PRI
100.0
VIEW
A.SEC
5.000
VIEW
V.PRI
415.0
VIEW
V.SEC
415.0
VIEW
SYS
STAR
VIEW
LABL
123
VIEW
BAUD
9600
VIEW
PRTY
EVn1
VIEW
ID
1.000
VIEW
F.S%
100.0
VIEW
OFLO
Wh
VIEW
POLE
4.000
VIEW
VA.Fn
3D
VIEW
d.SEL
AUTO
VIEW
d.PAR
VA
VIEW
d.PRD
15.00
EDIT
EDIT
MODE
A.PRI
100.0
EDIT
A.SEC
5.000
EDIT
V.PRI
415.0
EDIT
V.SEC
415.0
EDIT
SYS
STAR
EDIT
LABL
123
EDIT
BAUD
9600
EDIT
PRTY
EVn1
EDIT
ID
1.000
EDIT
F.S%
100.0
EDIT
OFLO
Wh
EDIT
POLE
4.000
EDIT
VA.Fn
3D
EDIT
d.SEL
AUTO
EDIT
d.PAR
VA
EDIT
d.PRD
15.00
A.PRI= Current primary winding (CT)*
SYS= Power system's configuration*
Select from: , DELTA, 2-phase, single-phase, STAR
V.PRI= Voltage primary winding (PT), line-line*
Input range: 100 V to 999 kV (415.0)
V.SEC= Voltage secondary winding (PT), line-line*
Input range: 80 V to 480 V (415.0)
Input range: 1 A to 99 kA (100.0)
A.SEC= Current secondary winding (CT) (
5.000)
LABL= Phase labeling
Select from: 123, RYB, RST, PQR, ABC
VA.FN= VA function selection*
Set the VA function to: 3D, ARTH
F.S%= Full scale %
Set the full scale between 1 to 100 1
POLE = Number of poles for RPM
Select from: 2, 4, 6, 8, 10, 12, 14, 16
BAUD= Baud rate
ID = RS 485 Device ID number:
001 to 247.
(
Evn.1 = Even.1 stop bit)
PRTY= Parity & Stop bit settings:EVN.1,
EVN.2, ODD.1,
ODD.2, no.1, no.2
OFLO = Overflow parameter selection: Wh, VAh; INTG
clears when 9999 Run hours (almost 13.88 months)
d.SEL = Demand Selection*
d.PAR = Demand Parameter*
d.PRD = Demand Period
Select from: , userauto
Select from: , W, AVA
Select from: 5, 10, , 20, 25, 3015
Select from: 1200, 2400, 4800, , 192009600
WYE
Comentarios a estos manuales