Schneider Electric Advantys STB Guía de instalación Pagina 65

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 108
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 64
65
Connections (continued)
Advantys
STB Distributed I/O
Solution 0
Analog input/output modules
Connections (continued)
Analog input modules
STB ART 0200
2 and 3-wire temperature probes 2-wire temperature probes
for highly disturbed operating
environments
2-wire thermocouple
and voltage sensor (mV)
1
2
3
4
5
6
A
B
1
2
3
4
5
6
U
U
Sensor 1
2-wire
Sensor 2
3-wire
(1)
(1)
A
B
1
2
3
4
5
6
U
U
1
2
3
4
5
6
Sensor 1
4-wire
Sensor 2
4-wire
(1)
(1)
(2)
(2)
1
2
3
4
5
6
A
B
1
2
3
4
5
6
Tc
+
U
Sensor 1
2-wire
thermocouple
Sensor 2
(mV)
(1)
(1)
4-wire temperature probes
1
2
3
4
5
6
A
B
1
2
3
4
5
6
U
U
Sensor 1
4-wire
Sensor 2
4-wire
(1)
(1)
(1) STB XSP 3000 grounding kit with STB XSP 3010/3020 connector mandatory.
(2) Double-shielded cable.
This document provided by Barr-Thorp Electric Co., Inc. 800-473-9123 www.barr-thorp.com
Vista de pagina 64
1 2 ... 60 61 62 63 64 65 66 67 68 69 70 ... 107 108

Comentarios a estos manuales

Sin comentarios